Fixed Installation (C320-TITO-INN)

  1. Switch off the power from the electrical panel.
  2. Remove the Control Unit lids and the strain relief.
  3. Remove the knock-out lids.
  4. Strip 10 mm from the end of all the wires. Connect the input (left side, power mains) and output (right side, stove/cooktop) wires.

    With 3-phase connection, the wiring order from the top: PE (yellow-green) - N (blue) - L3 (grey) - L2 (black) - L1 (brown).

    In case of 1-phase connection, connect PE-N-L3 on both sides.

    In case of 2-phase connection, connect PE-N-L3-L2 on both sides.

    Note: Do not overtighten the screws.

    3-Phase wiring

    1-Phase wiring

    2-Phase wiring

  5. Attach the strain relief.
  6. Close the Control Unit lid.
  7. Remove the protective film from the adhesive tape and firmly press and hold the unit against the wall for one minute to make sure that it is properly attached to the wall.
    Note: Optionally, you can attach the unit to a wall with four M4 screws.
  8. Connect the stove power plug.
    Make sure that the plug is properly plugged all the way.
  9. Switch on the power to the stove from the electrical panel.