Load balancing

The load balancing set up consists of a host charging station unit and up to three client units.

1. Host2. Client
a. Client 1b. Client 2c. Client 3

Wiring for load balancing

The client charger units are connected to the host charger using the right-hand side cable inlet. A rubber grommet is used to prevent dust and moisture entering the charging station. Before inserting the cables, make a small cut in the grommet for each cable entering the cable inlet. Recommended cable type for RS-485: ELAQBY/ELAKY 2X2X0,6 or similar.